Reference list for technical feasibility report
1Yırcalı Holding - Karlıtepe RES
(30 MWe/35 MWe) İşletmede
2Yırcalı Holding - Gökzirve RES
(25.2 MWe/28 MWm) İşletmede
3Erdem Holding - Eber RES
(36 MWe/39 MWm) İşletmede
4Ahsen Enerji - Akdağ RES
(23 MWe/23.625 MWm) İşletmede
5Yırcalı Holding - Akhisar RES Ext. I
(10 MWe/10 MWm) İşletmede
6Erdem Holding - Ödemiş RES Ext.
(21 MWe/21 MWm) İşletmede
7Ulusoy Enerji - Söke RES
(104 MWe/103.5 MWm) İşletmede
8Egener Elektrik - Karabel RES
(3 MWe/3.4 MWm) İşletmede
9MBD İnşaat - YEKA RES-3
(30 MWe/30 MWm) İşletmede
10Tatmetal Çelik - Şule RES
(60 MWe/66 MWm) İşletmede
11Rönesans Enerji - YEKA RES-3
(170 MWe/170 MWm) İşletmede
12Merkom Enerji - Yeldeğirmeni RES
(5.0 MWe/6.0 MWm) İşletmede
13Baysal Elektrik - Bayır RES
(10 MWe/10.8 MWm) İnşaat aşamasında
14Baysal Elektrik - Çepni RES
(10 MWe/11 MWm) İnşaat aşamasında
15Yırcalı Holding - Dökükdağı RES
(30 MWe/30 MWm) Proje aşamasında
16Yırcalı Holding - Akhisar RES Ext. II
(7 MWe/7 MWm) Proje aşamasında
17Yırcalı Holding - Karlıtepe RES Ext I
(5.56 MWe/5.56 MWe) Proje aşamasında
18Erdem Holding - Eber RES Ext.
(26.4 MWe/26.4 MWm) Proje aşamasında
19Kıroba Elektrik - Madranbaba RES Ext.
(9.6 MWe/9.6 MWm) Proje aşamasında
20Entek Elektrik - Süloğlu RES Ext.
(80.6 MWe/80.6 MWm) Proje aşamasında
21Asia Global - Depolamalı RES
(275 MWe/275 MWm) Proje aşamasında
22Nesma Enerji - Depolamalı RES
(300 MWe/300 MWm) Proje aşamasında
23Sertavul RES Elektrik Kuşakdağı DRES
(100 MWe/100 MWm) Proje aşamasında
24Güngör Elektrik - Şahinkaya DRES
(20 MWe/30 MWm) Proje aşamasında
25BZK Enerji - Yellibel DRES
(20 MWe/20 MWm) Proje aşamasında
26Milak Enerji - Depolamalı RES
(310 MWe/310 MWm) Proje aşamasında
Reference list for wind measurement
1Kalyon – Türkerler – Siemens Consorcium – YEKA-1 WPP - Ankara
4 x 100m met mast (Kırklareli, Edirne)
4 x 80m met mast (Sivas, Eskişehir)
4 x 80m met mast (Sivas, Eskişehir)
2Enerjisa Enerji Üretim A.Ş. - YEKA-2 WPP - İstanbul
6 x 80m met mast (5 mast in Çanakkale and 1 mast in Aydın)
3Rönesans Enerji - YEKA-3 WPP & Storage WPP - Ankara
8 x 80m met mast
4Kalyon Enerji - YEKA-3 WPP - Ankara
4 x 80m met mast
1 x 60m met mast
1 x 60m met mast
5MBD İnşaat - YEKA-3 RES & Storage WPP - Ankara
3 x 80m met mast
6PNE Wind – Ankara - Ovacık (Köseler) WPP
1 x 100m met mast
7BME Enerji – İstanbul – Unlicensed WPP
4 x 100m met mast
8Ekvator Enerji – Storage WPP
2 x 80m met mast
9Artıbir Enerji – Storage WPP
2 x 80m met mast
10Asia Global – Ankara - Storage WPP
3 x 80m met mast
11Sertavul Elektrik – Antalya - Storage WPP
2 x 80m met mast
12RES Anatolia Holding - İstanbul
5 x 60m met mast
2 x 100m met mast
2 x ZephIR Lidar
2 x 100m met mast
2 x ZephIR Lidar
13Erdem Holding – Enyat Enerji - İstanbul
25 x 80m met mast
14Yırcalı Holding – Karesi Enerji
19 x 80m met mast
15T-Dinamik Enerji - İstanbul
18 x 80m met mast
16Aksu Group – Aksu Madencilik - Ankara
3 x 80m met mast
17Alen Enerji - Ankara
7 x 80m met mast
18Aygül Elektrik San Tic AŞ - Bursa
3 x 80m met mast
19Baysal Elektrik Üretim AŞ – Trabzon
4 x 80m met mast
20BW Enerji – Kayseri
4 x 80m met mast
21Güngör Elektrik – Ankara
3 x 80m met mast
22Kar Elektrik Üretim Ltd Şti – İstanbul
4 x 80m met mast
23Merkom Enerji San Tic AŞ – Balıkesir
4 x 80m met mast
24OTG RES Elektrik Üretim AŞ – Ankara
4 x 80m met mast
25SEMAY Enerji Sistemleri Müh San Tic AŞ – Ankara
2 x 80m met mast
26TBK Enerji Elektrik Ür Dağ Paz San Tic AŞ – Ankara
1 x 80m met mast
27Ulusoy Elektrik – Ankara
11 x 80m met mast
Reference list for project development
1ALEN Elektrik Üretim San Tic AŞ - Ankara
6 WPP projects were developed for the 2015 wind pre-license application. The projects are in the grid connection zone of Antalya, Canakkale, Balkesir, Bursa, Tekirdağ and Karaman.
2AYGÜL Elektrik San Tic AŞ – Bursa
3 WPP projects were developed for the 2015 wind pre-license application. The projects are in the grid connection zone of Kırklareli, Çanakkale and İzmir.
3BAYSAL Elektrik Üretim AŞ – Trabzon
3 WPP projects were developed for the 2015 wind pre-license application. The projects are in the grid connection zone of Bursa, Ordu and Isparta. The wind projects in Bursa and Ordu have received pre-licenses.
4BW Enerji - Kayseri
4 WPP projects were developed for the 2015 wind pre-license application. The projects are in the grid connection zone of Balıkesir, Adana, Karaman and Kayseri.
5Güngör Elektrik - Ankara
3 WPP projects were developed for the 2015 wind pre-license application. The projects are in the grid connection zone of Balıkesir, Ordu and Manisa.
2 WPP projects were developed for the 2022 wind pre-license application with storage unit in the grid connection zone of Balıkesir and Manisa. The wind project in Balıkesir has received a pre-license.
2 WPP projects were developed for the 2022 wind pre-license application with storage unit in the grid connection zone of Balıkesir and Manisa. The wind project in Balıkesir has received a pre-license.
6KAR Elektrik Üretim Ltd Şti – İstanbul
4 WPP projects were developed for the 2015 wind pre-license application. The projects are in the grid connection zone of Balıkesir, Çanakkale, Karaman and Kayseri.
7KARESİ Enerji – Balıkesir
12 WPP projects were developed for the 2015 wind pre-license application. The projects are in the grid connection zone of Balıkesir, Çanakkale, İzmir, Manisa, Kırklareli, Tekirdağ, Mersin, Antalya, Kayseri and Samsun. The wind project in Antalya has received a pre-license.
8MERKOM Enerji San Tic AŞ – Balıkesir
2 WPP projects were developed for the 2015 wind pre-license application. The projects are in the grid connection zone of Balıkesir and Çanakkale. The wind project in Çanakkale has received a pre-license.
9OTG RES Elektrik Üretim AŞ – Ankara
4 WPP projects were developed for the 2015 wind pre-license application. The projects are in the grid connection zone of Balıkesir, Antalya, Muğla and Tekirdağ.
10SEMAY Enerji Sistemleri Müh San Tic AŞ – Ankara
2 WPP projects were developed for the 2015 wind pre-license application. The projects are in the grid connection zone of Balıkesir and Çanakkale.
11Tdinamik Enerji San Dış Tic AŞ– İstanbul
12 WPP projects were developed for the 2015 wind pre-license application. The projects are in the grid connection zone of İzmir, Edirne, Çanakkale, Tokat, Muğla, Samsun, Balıkesir, Adana, Kırklareli, Mersin, Malatya and Samsun.
12Ulusoy Elektrik Enerji Yatırımları AŞ – Ankara
11 WPP projects were developed for the 2015 wind pre-license application. The projects are in the grid connection zone of Balıkesir, Kırklareli, Karaman, Çanakkale, Muğla, Kayseri, Adana, Tekirdağ and Konya.
13Sertavul RES Elektrik Üretim AŞ – Antalya
3 WPP projects were developed for the 2022 wind pre-license application with storage unit in the grid connection zone of Kırklareli, Konya and Antalya. The wind project in Antalya has received a pre-license.
14Bzk Enerji Üretim San Tic AŞ - Ankara
2 WPP projects were developed for the 2022 wind pre-license application with storage unit in the grid connection zone of Tekirdağ and Antalya. The wind project in Antalya has received a pre-license.
15BEYRES Enerji Üretim San Tic AŞ – Ankara
3 WPP projects were developed for the 2022 wind pre-license application with storage unit in the grid connection zone of Ankara, Balıkesir and Mersin. The wind projects in Ankara and Balıkesir have received pre-licenses.
16ENTEK Elektrik Üretimi AŞ – İstanbul
3 WPP projects were developed for the 2022 wind pre-license application with storage unit in the grid connection zone of Kayseri, Tekirdağ and Mersin. The wind projects in Kayseri and Tekirdağ have received pre-licenses.
17Asia Global Enerji Yatırım AŞ – Ankara
6 WPP projects were developed for the 2022 wind pre-license application with storage unit in the grid connection zone of Karaman, Antalya, Kırklareli, Mersin, Muğla and Yozgat. All wind projects have received pre-licenses.
18NESMA Enerji Yatırım AŞ – Ankara
6 WPP projects were developed for the 2022 wind pre-license application with storage unit in the grid connection zone of Adana, Isparta, İzmir, Konya, Manisa and Samsun. All wind projects have received pre-licenses.
19KALTUN Madencilik – Aydın
In the 2023-2025 period, 6 unlicensed WPP applications were made in Çanakkale to meet the electricity consumption of mining facilities belonging to Kaltun Madencilik. As a result of the applications, grid connection agreements were signed for 3 of them with a total installed capacity of 17.4 MWe.
20MKS Marmara – Bursa
In the 2022-2024 period, 2 unlicensed WPP applications were made in Balıkesir to meet the electricity consumption of facility belonging to MKS Marmara. As a result of the applications, grid connection agreements were signed for 2 of them with a total installed capacity of 14 MWe.
Reference list for solar measurement
1Karesi Enerji - Balıkesir
2 solar measurement campaign in Nevşehir Derinkuyu and Kayseri Yeşilhisar.
2Tdinamik - İstanbul
6 solar measurement campaign in Denizli Bozkurt, Karaman Barutkavuran, Konya Karapınar, Niğde Bor Kemerhisar, Van Muradiye Ünseli, Konya Çumra Alibeyhüyüğü and Muğla Merkez.
3Güngör Elektrik – Ankara
2 solar measurement campaign in Antalya Korkuteli and Niğde.
Reference list for meteorological measurement
1Polyak Eynez Enerji Üretim Madencilik San. Tic. A.Ş. – İzmir
Measurement for agricultural purposes has been completed for the following parameters:
- Wind speed
- Wind direction
- Temperature
- Humidity
- Air pressure
- Solar irradiation
- Precipitation
- Soil temperature
